# TrafIQ — current corridor evidence

Reviewed 17 November 2026. All results are simulations, not real-road trials.

## Matched rerun, 16 November 2026

The shipped Double-DQN policies plus supervisor were compared with protected-left fixed-time control. Requested duration 7,200 s (7,201 samples including initialization), seed 20261121, pedestrian clearance and trotro boarding enabled, legacy occupancy observation, graded exit capacity disabled.

| Evening case | Mean stopped vehicles | Completed arrivals |
|---|---:|---:|
| Adaptive plus supervisor | 98.87 | 3,981 |
| Fixed timer | 91.17 | 3,953 |

Mean stopped vehicles is stopped vehicle-seconds divided by simulation time. Halting uses SUMO’s speed below 0.1 m/s threshold. It is not mean delay. Arrivals exclude unfinished demand. Adaptive completed 28 more trips while carrying a larger stopped queue on average.

Morning adaptive: 110.10 mean stopped, 3,797 arrivals, no teleports, one unresolved minimum-gap vehicle-pair event. The colliding-vehicle counter of 2 is not two independent crashes; the source review does not establish physical overlap. These inspected seeds are regression evidence, not a new generalization study.

## Ideal sensor reconstruction

Three scenarios (morning seed 42, evening 179, off-peak 316) each cover 7,201 one-second samples including initialization. Across three junctions and both input scales: 129,618 exact input vectors, 64,809 matching supervisor observations and 12,960 matching decisions. This establishes software equivalence with ideal simulator frames, not physical detection accuracy, occlusion handling, weather tolerance or certification.

## Development status

Implemented: the three-junction N6 corridor, trained local policies plus supervisor, SUMO traffic and Python control, Godot rendering and measured operator interface.

Planned: richer neighbour communication, cooperative training and optional read-only Ollama analysis. Ollama is not the signal controller.

Hardware concept: TSH-1 radar, wide/tele cameras, thermal sensing and edge compute. Physical builds, field calibration, performance validation and certification remain future work.

Source: TrafIQ project’s corridor handoff review (16 November 2026) and corridor deployment investigation/results (14 November 2026), supplied by Valiborn Technologies for this website update. The source project is available at https://github.com/Bigbee-x/ATCS-GH; this summary describes the reviewed local development state.